11–12Industrial Technology 11–12 Syllabus (2026)
The new Industrial Technology 11–12 Syllabus (2026) is to be implemented from 2028 and will replace the Industrial Technology Stage 6 Syllabus (2013).
2027
- Plan and prepare to teach the new syllabus
2028, Term 1
- Start teaching the new syllabus for Year 11
- Start implementing new Year 11 school-based assessment requirements
- Continue to teach the Industrial Technology Stage 6 Syllabus (2013) for Year 12
2028, Term 4
- Start teaching the new syllabus for Year 12
- Start implementing new Year 12 school-based assessment requirements
2029
- First HSC examination for the new syllabus
Content
Year 11
Loading must be integrated throughout each focus area in Year 11 and 12.
Outline project goals, user needs, constraints and intended outcomes
Develop criteria for success to guide design decisions, production planning and evaluation
Use sketching, technical drawing and modelling techniques to generate and refine design concepts
Use orthogonal, pictorial, exploded, sectional and other drawing types to communicate project development
Develop manual and digital layout strategies to support design visualisation and specification
Create physical and digital prototypes and models to explore and test designs
Use stakeholder and user feedback to guide iterative design refinement
Identify ethical, cultural and sustainability considerations for project design and production
Document design thinking including annotated drawings and photographs
Evaluate design concepts based on user needs, functional goals and material limitations
Explain how the properties and characteristics of materials and components affect selection, machining, assembly and finishing processes
Select tools, equipment and process options aligned with project requirements and production performance
Assess the availability and suitability of proposed production methods and materials
Apply drawing conventions, dimensioning, symbols and multiple views in technical documentation
Develop planning, costing and documentation strategies
Explain how selected materials, tools and production methods support design feasibility and production requirements
Create planning documentation that supports time management, sequencing of production steps, workflow organisation and milestone tracking
Record key production stages including planned processes and available resources during project production
Assess project feasibility aligned to budget and costing considerations
Create working drawings and specifications to guide manufacturing processes
Outline design brief requirements, constraints and practical production considerations
Identify project planning strategies and risk mitigation measures that support safe and continuous production
Describe stages of the production process
Communicate project progress through written, visual and digital documentation
Document design decisions, production adjustments and evaluation records from concept to completion
Apply problem-solving strategies to refine processes, materials and techniques
Use documented project intent and criteria for success to guide design refinements during project development
Document design adjustments made in response to feedback and challenges to improve outcomes
Evaluate project outcomes against functional performance, user needs and defined success criteria
Document modifications made during production related to planning, the project intent and WHS considerations